Getting started
From launch to a full read-out of your switch takes about a minute: connect, and ICX Setup assesses the switch automatically and drops you on the assessment screen.
1. Install and launch
Section titled “1. Install and launch”Install ICX Setup from the Mac App Store and open it. There is no sign-up and no account. The app opens on a Welcome screen with three ways to start:
| Card | What it does |
|---|---|
| Load Deployment Profile | Open an .icxprofile file prepared by your network engineer, then connect. See Full Deploy and profiles. |
| Connect via Console | Connect a USB serial cable and explore switch options. |
| Connect via SSH | Remote connection over the network (FastIron 9.0+). |
2. Connect to the switch
Section titled “2. Connect to the switch”A factory-fresh switch has no IP yet, so start with the console cable. Plug a USB-to-serial console cable from your Mac into the switch’s console port and choose Connect via Console. ICX Setup scans your serial ports and flags the likely console adapter with a green Recommended badge — pick it and it connects, auto-detecting the baud rate.
Once a switch already has a management IP, you can Connect via SSH instead: enter the host, port (default 22), and username (default super).
Either path is covered in full — including USB adapters, baud rates, and SSH host keys — in Connecting to a switch.
3. Read the assessment
Section titled “3. Read the assessment”The moment it connects, ICX Setup escalates to the switch’s privileged prompt and reads its state — model, serial, firmware version, stack status, and whether it’s already talking to a management controller. That all lands on the Assessment screen. See Assessing a switch for what each field means.
4. Choose what to do
Section titled “4. Choose what to do”From the assessment you either:
- Choose an Action — Upgrade Firmware, Build Stack, or open the Terminal, or
- Begin Full Deployment — if you loaded a deployment profile, run the whole stack → upgrade → adopt → verify sequence in one go.
Next steps
Section titled “Next steps”- Upgrading firmware — move a switch to a target FastIron version.
- Building a stack — join standalone units into a stack.
- Adopting to a platform — hand the switch to RUCKUS One or SmartZone.
- Full Deploy and profiles — the guided end-to-end run.
Stuck? Contact support.